The city's Public Works and Engineering Division issues permits for grading, streets, storm drains and work in the public right of way. Its list names that work and not driveway building, so it doesn't settle whether your driveway needs a permit. That's the office to ask. When a job needs a permit, we handle the application and meet the inspector on site. If we aren't sure, we check with that office before we start.
The city also keeps standard drawings for curbs, driveways and alleys. When you're hiring, know that California requires a license from the Contractors State License Board for any job that needs a building permit, uses other workers or comes to $1,000 or more in labor and materials. The board's concrete class covers pavement and flat work like driveways.
Most of our driveway calls come from Murrieta homeowners and small property owners. A lot of them start with an old slab that's cracked, sinking at one corner or holding water by the garage. We do the same work across the cities nearby, including Temecula and Menifee, and we prep the base the same way there.